October Progress

The days of the Phase One project are slowly drawing to a close. Most of the project will wrap up within the month of November. Some things are already finished, like the East Courtyard and the Kitchen and Serving area. Rather than posting updated gallery links, new galleries have been created to display the work of October. New work is happening every day, but it is sometimes hard to capture — this far into the project, big visible differences are hard to come by and so the photos show updates about every 2 weeks or so. That way, you can see the cumulative difference. Below are all the newest galleries.

Finished parts of the Project

East Courtyard and President’s Quad

Kitchen and Serving Area

Stoeckhardt Hall

Unfinished parts of the Project

Lower Level

Third Floor

Second Floor

Elevator

Koburg Hall

Sidewalk Entry to Benidt Center

Guenther Hall

Unrelated Project, but concurrent with Phase One

Academic Quad Reflecting Pool and Seating Areas

~ by Site Administrator on October 27, 2011.

Leave a Reply