East Courtyard Making Progress

Over the last two weeks, the East Courtyard has made significant progress. After the piers were in place, limestone was delivered to set the first base over which the new pavers will sit. Before the limestone was spread out, the drainage system was laid throughout the courtyard. The drainage system was necessary because he pavers will be permeable, allowing for water to drain away through the surface itself, rather than running off, or having physical drains installed. The new drainage system taps into some of the new sewer work done earlier in the Spring.

Check out the photo gallery below which shows the newest work happening in the East Courtyard. Click here to see some of the previous work.

~ by Site Administrator on July 27, 2011.